- Browse Categories
- Air Freight
- Sea Freight
- Contact Us
-
TEL:+86-755-25643417
Fax: +86 755 25431456
Address:Room 806, Block B, Rongde Times Square, Henggang Street, Longgang District, Shenzhen, China
Postcode: 518115
E-mail: sales1@swwlogistics.com.cn Contact Now
- Logistics Services
- News CenterMore>>
-
- Philippine Ports Authority releases freight data: Manila Port throughput increases steadily and digital customs clearance upgrades
- Philippine port throughput is rising steadily: cargo volume will exceed 154 million tons in 2026
- Philippine sea and air cargo throughput grows strongly: ports and airports accelerate port dredging and improve efficiency
- The Philippines comprehensively promotes the construction of the Luzon Economic Corridor and SCMB freight railway and strives to solve the problems of port congestion and high freight rates.
- Multiple Philippine ministries and commissions have promoted the JAO joint administrative order: comprehensively standardizing container management and shipping miscellaneous charges to resolve the year-end congestion crisis at Manila Port
- Philippines cross-department finalizes JAO administrative order to break port congestion: expand storage yard and extend customs inspection
- Multiple departments in the Philippines have joined forces to promote port dredging and freight reform to comprehensively relieve the pressure on Manila's shipping stagnation at the port.
- Philippine port delays rise during peak season, Clark aviation hub opens
- The Philippine Ports Authority has increased loading and unloading rates at the Port of Manila and taken multiple measures to address empty container storage and supply chain congestion.
- The volume of foreign trade cargo at Philippine ports has grown steadily, and the customs and port authorities have strengthened digital transportation.
- Certifications
-
- Follow us
- Subscribe
-
Get email updates on new products
Hotel Supplies and FF&E Shipping China to Philippines | DDP
- Place of Origin: China
- Departure Country/Region: CHINA (Foshan / Guangzhou / Shenzhen)
- Destination Country/Region: PH (Philippines - Manila, Cebu, Davao, resort areas)
- Transit Time (Days): Sea: 15 Days (Manila) / 25 Days (Cebu & Davao); Air: 3-5 Days
- Shipping Method: DDP Door to Door (Sea LCL & FCL)
- Cargo Type: Guest room furniture, loose furniture, OS&E cartons, textiles and amenities
A hotel opening date is set months before the first guest arrives, and it does not move for a container. Yet a fit-out is bought from forty suppliers in three provinces, each with its own lead time, and every one of them believes their part is the urgent one.
Sunny Worldwide Logistics has moved project cargo on the China–Philippines lane for more than 20 years. Hotel work is less about freight rates than about sequence: what has to be on site first, what can wait in a warehouse, and what must never be opened twice.
Why a Fit-Out Is a Sequencing Problem
Guest room furniture cannot be installed before the floors are finished, and the floors cannot be finished while cartons are stacked on them. Case goods arrive before mattresses, mattresses before linen, linen before the operating supplies that housekeeping needs on day one. Ship everything at once and the site manager stores half of it in the lobby.
The usual failure is not a late container. It is a container that arrives complete, three weeks early, at a property with no locked storage and a contractor who is still working on the third floor.
We plan the shipment in phases against the construction programme. Phase one is the bulky items that need space and time: case goods, loose furniture, headboards. Phase two is the fragile and high-value items that should arrive when the rooms are secure. Phase three is the operating supplies that only make sense at handover.

Why DDP Suits a Project Budget
A fit-out budget is approved line by line, and a landed cost that changes after arrival is a conversation nobody wants with the owner. Duty and VAT on furniture, textiles and amenities differ by item, and a single lump-sum declaration will not survive scrutiny.
Under DDP terms the cost is fixed before loading. Clearance, duty, VAT and delivery sit in one number per phase, which means the project accountant can close the logistics line while the contractor is still arguing about tiles.
It also removes a practical problem. Hotels are usually imported by a project company rather than a trading company, and that company may not hold the accreditation to act as importer of record. We work through that structure at quotation stage rather than at the port; our guide to importer of record in the Philippines sets out who can hold the role.
How We Handle Hotel Cargo
Case goods and loose furniture
Wardrobes, desks, minibar cabinets and headboards are heavy, veneered and easily chipped at the corners. They travel crated or corner-protected, loaded at the base of the stack, and inspected at our warehouse before loading because a damaged edge is cheaper to fix in Foshan than in Manila.
Textiles and soft furnishings
Curtains, bedding, towels and upholstery fabric are dense but vulnerable to moisture. Cartons are lined, pallets are wrapped, and the container is checked for condensation before the doors close. A shipment that arrives smelling of damp is a total loss to a hotel, not a partial one.
OS&E cartons and amenities
Operating supplies arrive as many small cartons with different owners: housekeeping, food and beverage, front office, engineering. We consolidate them by department and mark the cartons accordingly, so the receiving team can hand each pallet to the right storekeeper instead of sorting four hundred boxes in the loading bay.
Lifts, signage and specialist items
Some project cargo is oversized or needs a permit before it can move inland. We check dimensions and route restrictions at quotation stage; an item that cannot pass a bridge is not a freight problem that can be solved on the day of delivery.
Documents and Classification
The invoice needs one line per item with a real description, material and unit value. "Hotel equipment" as a single line is not a description, and it is the reason project shipments sit in examination while the opening date approaches.
Where the property is in a special economic zone or a tourism incentive scheme, the import treatment may differ. Tell us before the booking, not after, and we will quote against the correct structure. For small pre-opening samples, our note on BOC de minimis rules explains when duty applies at all.

How the Shipment Moves
- Collection. Pickup from factories in Foshan, Guangzhou and Shenzhen with our own trucking fleet, counted and photographed at the door.
- Consolidation and staging. Receiving at our warehouse, damage check, re-crating where needed, and pallet marking by floor, room type or department.
- Export and ocean leg. Declaration filed against the item-level invoice, container booked to Manila, Cebu or Davao. Sea freight runs about 15 days door to door to Manila and about 25 days to Cebu or Davao.
- Clearance and delivery. Duty and VAT assessed and paid, container released to our broker, and delivery to the property. Clearance typically runs 1 to 2 days ahead of the industry average, and delivery is free within 30km of the Metro or downtown area.
For a property outside that radius, or one with a restricted delivery window, we agree the access plan before the container arrives. The sequence is set out on our service flow page, and the same terms apply on our China to Cebu routing for provincial properties.
Why Shippers Choose Sunny Worldwide Logistics
We own the first mile. Our own trucking fleet works the Shenzhen and Guangzhou ports, so collection from a furniture factory stays under our control rather than being handed to a subcontractor.
More than 20 years on this lane, through every change in Philippine import rules. NVOCC and FMC registered, and members of the Worldwide Cargo Alliance, CIFA, JCTRANS, WIFFA, FUDA, SZSSA and OLO.
Every inquiry gets at least three routing or consolidation options, designed to save clients at least 5% against their current arrangement. Optional cargo insurance is available, and the warehouse system keeps a record of what has arrived, what has shipped and what is still expected — which on a fit-out is the question the project manager asks every morning.
Frequently Asked Questions
Can you hold part of a fit-out in your warehouse?
Yes. Staging is the point. Goods that would sit unprotected on site can wait in our warehouse until the property is ready, and we release them against the construction programme rather than against the factory's dispatch date.
Do you deliver floor by floor?
We deliver to the property and, where the access and the lift schedule allow, to the floor. That is agreed before arrival, because a hotel lift that is still being commissioned changes the whole delivery plan.
What happens if one supplier is late?
We tell you as soon as it is known, with the sailing options that still meet the date and the cost of each. Shipping a partial fit-out and air-freighting the shortfall is often cheaper than delaying a whole phase.
Send the item list, the supplier locations and the delivery schedule, and you will get a phased DDP figure with the classification already checked. Contact Sunny Worldwide Logistics — we take care of the cargo more than the owner does.